To: RCPL Trustees
From: Greta Chapman, RCPL Director
RE: RCPL 2009 – 2011 Draft Budget Narrative
Date: March 4, 2008
The 2009 – 2011 budget is built upon the Library Strategic Plan to address increased use of library services; continuing to strengthen our community by building a strong and literate work force; and extending access to cutting edge technology.
The Goals that address the public’s use of library services are:
·
Maintain the Library as a
· Continue to develop intuitive, mobile, and user-friendly library services for all ages
· Increase public awareness of existing and evolving services
Operational costs are based upon a 3% guideline. Costs outside of the 3% guideline our identified below:
|
2009 Capital |
|
|
||||||||||
|
|
|
|||||||||||
|
One Time expenditures outside of ongoing
operational costs at 3% 1.
Total Cost: $108,310 Automated checkout and inventory control – one time
expenditure (requested in 2007). Strategic plan: To set goals and benchmarks for improving
self service technology and advancing RCPL into the next stage of material
flow management. For the public, this will allow improved access to collections using
better inventory and catalog tools, and enhanced self-service, including
self-check out and self-checking. The
library is currently 1.0 FTE understaffed according to national standards for
libraries serving populations of similar size. The implementation of this automated system
will allow the library to maintain the growth of library use with current
staffing levels.
|
|||||||||||
|
2. Total Cost: $57,253 Completion of main floor public space reconfiguration at downtown library. Strategic plan: Maintain the library as a community gathering place for all ages. The overall project budget is $334,600, of which $277,347 was raised through private funding and from fines and fees. Originally requested in 2008 at an amount of $75,126. · Painting main floor public area: $10,000 · Public local history digitization center: $31,000 · Contingency: $16,253 3. Total Cost: $31,982 1 FTE Facilities Maintenance Operations Worker (salary + benefits) (Requested in 2006) Existing staffing is under based on industry standards and impacting negatively facilities maintenance.
Comparisons: FTE
status for other facilities (cleaning support only)
|
|||||||||||
|
2010
Capital |
|
|
|
|
|
I. Vehicle for Travel related to training and statewide library development. Total Cost: $17,000 Reduce the per diem expenses due to personal vehicle use. Limited availability for use of city vehicles from other departments. Statewide library development includes participation in the South Dakota Library Network, South Dakota State Library, South Dakota Library Association, Black Hills Librarians Network |
|
2011